[x] Close
Project DetailsThis church congregation needed additional space for their ministry and felt that their overall facility needed a facelift from its 1970’s design. The design team met with the building committee and conducted a comprehensive space plan and then developed a master plan that could be implemented in phases. Phase I will be a new 300 person sanctuary. Phase II will be renovation of the existing sanctuary into classroom space, and Phase III will be a new Fellowship Hall. We are currently designing phase I which will provide the church with a new sanctuary and the facelift for the exterior of the facility. The sanctuary will include stained glass windows, a stone baptismal pool, and high end Audio-Visual equipment for church services and other events. The exterior will include a rock veneer. |
| Project Details | Photos: 1 2 3 4 5 |